Stormwater Capital Improvement Projects
Google Android Download our new Android Apps...City News & Events + FMPD News
Google Android Download our new Android Apps...City News & Events + FMPD News
Stormwater Capital Improvement Projects

Active Projects Budgeted Cost Expected Completion Date Status Description
Brookhill Subdivision Drainage Improvements $2,114,000 2011 Under Construction Piping the drainage, catch basins and water quality improvements.
Manuels Branch Watershed Drainage Improvements $1,570,000 2011 Under Construction The neighborhood between McGregor Boulevard and the river, and between Winkler and Carrell Canals suffers from seasonal flooding due to lack of a functioning drainage system. This project will construct improvements recommended by the city's consultant. FEMA subgrant agreement approved 02/07/07. FEMA to fund 75% of cost.
Dean Park Neighborhood Improvements $1,645,000 2011 Under Construction The Dean Park neighborhood suffers from frequent, severe flooding due to its low elevation. An existing stromwater pump station is unable protect the neighborhood because water from Billy's Creek and the Caloossahatchee flow into the neighborhood during and after rainfall and high tides. This project will fund a drainage study of the problem, engineering and permitting of a solution, and construction of the recommended improvements. Project has FEMA funding for 75% of the total cost.
Manuels Branch Silt Structure $184,000 2011 Under Construction Installs a weir by the Fort Myers High School to trap sediments into a treatment area. This water body is impaired and has an issue with suspended solids in this area due to unstable banks. This shall be the last treatment system that is available prior to discharging to Caloosahatchee River. Grant from SFWMD for $92,000 with 50% match required.
Marsh Avenue Drainage Improvements $200,000 2011 Construction in 2011 The project consist of installation drainage pipes in the right of way to address traffic hazard and reduce dumping in the ditch.
Ford St. Canal Drainage Improvements (Phased Project) $400,000 2013 Design Complete Improve Ford Street Canal from Edison Ave. to Hanson St. to better convey stormwater runoff, reduce maintenance, and provide some water quality treatment in order to comply with the city's NPDES permit. Project involves constructing a stormwater treatment facility that will add storage to the watershed, reduce flooding and improve water quality. Grant from FDEP has been obtained in the amount of $200,000 with 50% match required.
10-Mile Canal Drainage Improvements $600,000 2013 In Design 10-Mile Canal Drainage Improvement project is to design and construct a water treatment facility on City owned property north of Hanson Street also known as the 10 Mile Canal. The project will result in the removal of fine suspended solids, which will increase the dissolved oxygen within the canal and address the major contaminate within the watershed. Grant from FDEP obtained for $300,000 with 50% match required.
South Ditch Piping (Matthew Dr.) $550,000 2012 In Design Design and construct a piped conveyance at the existing drainage ditch called South Ditch from West Street east to L-3 Canal. This will increase safety and improve aesthetics along the front of Sam Fleischman Park and will also reduce maintenance costs annually.
McGregor Boulevard Drainage Rehabilitation (Phased Project) $240,000 2011 In Design Determine cause and extent of drainage system failure along McGregor Boulevard between Colonial Boulevard and downtown, design, permit, and construct repairs. Price has been reduced from previous estimates due to ongoing PW Operations repair efforts to mitigate the problem. Project is NOT funded through Stormwater Utility, but through general City funds.
Stormwater Flail Mower (Equipment) $110,000 2011 Inprocess
Citywide Drainage Rehab & Drainage Improvements $1,170,000 Ongoing Ongoing Construct small drainage improvement projects throughout the city to resolve localized flooding and water quality problems with simple solutions.
Citywide Trunk System Improvements (Phased Project) $115,000 Ongoing Ongoing Acquire rights-of-way and establish trunk system throughout the watershed. Evaluate and re-establish existing outfalls throughout the City's watershed to improve/enhance drainage and water quality. Evaluate the performance of existing trunk system and tributaries. Construct improvements to tributaries and canals for areas that were identified through the evaluation. Improvments shall be: introducing additional storage back into the watershed and replacing deficient drainage structures within the conveyance system
Billy Creek Drainage Improvements West of I75 (Billy's Creek Filter Marsh) 2,363,000 2010 Complete To improve Billy Creek to better convey storm water run off , reduce maintenance and provide water quality treatment in order to comply with the City's NPDES permit. South Florida Water Management funding $1,000,000 with 50% match required.
BMWC Water Quality Improvement $603,000 2010 Complete Improve areas known as BMWC,(Billy Creek, Manuels Branch, Winkler Canal, and Carrell Canal) to better convey stormwater runoff, reduce maintenance, and provide some water quality. (Updated in accordance with Master Plan 5-Year CIP suggested projects)
Drainage Phase III, IV and Downtown (Phased Project) $2,722,000 2009 Complete Drainage rehabilitation will be required in connection with water/sewer replacement. Areas include: Phase III area south of Edison Ave, north of Hansen St west of Fowler Ave and east of US 41; Phase IV area south of Manuels Branch, north of Winkler Ave east of the Caloosahatchee River and west of MLK Blvd; Downtown Redevelopment area.
Stormwater Master Plan Update $193,000 2008 Complete Update of stormwater master plan to address flooding and water quality issues.
Stormwater Gradall (Equipment) $340,000 2011 Complete Purchase of equipment to excavate silted sections or collapsed sections of ditches/canals.
Stormwater Small Slope Mower $110,000 2011 Complete Purchase of equipment to mow the banks of the canals/ditches.

  Stormwater Capital Improvement Projects

Description        Last ModifiedAuthorCreatedSize
DetailsDean Park Neighborhood10/5/2010 10/5/2010
DetailsManuels Branch Drainage Improvements11/8/2010 11/8/2010
DetailsManuels Branch Siltation Structure11/23/2010 11/23/2010

Copyright City of Fort Myers Terms of Service